Equipotential Bonding Requirements for Pools

For equipotential bonding of pool and spa equipment, a solid 8 AWG copper conductor shall be run back to the service equipment. This conductor shall be unbroken.

a) True
b) False

See answer and applicable Code reference

The correct answer is: b) False

The installation requirements for permanently installed pools are outlined in Part II of Article 680 in the 2011 NEC. As noted in Sec. 680.26(B), "The parts specified in 680.26(B)(1) through (B)(7)

Register to view the full article

Register on EC&M and gain access to premium content, including this article and much more.

Hide comments

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish