CORRECTION

Aug. 1, 2005
The January 2005 Illustrated Catastrophes column called attention to an installation at a water plant in northern Ohio in which a flexible cord ran from an explosion-proof junction box to a PVC-coated conduit body. The submitter incorrectly asserted that the area was hazardous, in which case the exposed connection would have violated 501.15. The flexible cord was used because the area it served wasn't

The January 2005 Illustrated Catastrophes column called attention to an installation at a water plant in northern Ohio in which a flexible cord ran from an explosion-proof junction box to a PVC-coated conduit body. The submitter incorrectly asserted that the area was hazardous, in which case the exposed connection would have violated 501.15. The flexible cord was used because the area it served wasn't accessible by any other means. The purpose of the explosion-proof box was to mount and protect a solid-state, low-voltage amplifier from the environment. The sensor was part of a chlorine alarm system and wasn't in a hazardous or classified area. The installation met the Code's requirements.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...

A Powerful Duo: Fiberglass conduit and solar applications

Learn how strong, durable fiberglass conduit excelled in an environment with dense cable and helped make a complex burial much simpler for the contractor to help this customer...

Champion Fiberglass® Conduit Protects Cabling For New York's First Offshore Wind Farm

Learn how fiberglass conduit supported a heavy cable load and a buried installation to help this project reach a successful outcome.