Many years ago, when I worked for an electric utility, I found myself in the position of tracking changes to the National Electrical Safety Code (NESC) and OSHA 1910 standards. As a support engineer, it was my job to review these changes, present them to our construction and maintenance personnel, and then update our work procedures to ensure compliance with the new rules. This process required me

Many years ago, when I worked for an electric utility, I found myself in the position of tracking changes to the National Electrical Safety Code (NESC) and OSHA 1910 standards. As a support engineer, it was my job to review these changes, present them to our construction and maintenance personnel, and then update our work procedures to ensure compliance with the new rules. This process required me to attend many meetings, take detailed notes, rewrite and draft new work procedures, and verbally communicate these changes to our field personnel. As you can imagine, these changes were most often met with some serious resistance. And with resistance comes stress. Needless to say, this stress made my job very challenging.

Many of us don't accept change as well as we should — myself included. We get comfortable with our surroundings and the rules that govern our work practices. Then, just when we have all the requirements committed to memory, someone has to implement a bunch of changes, forcing us to re-examine our daily routines and work practices. This makes us work harder and invest additional time in training. Viewing some or many of these changes as unnecessary, many of us immediately think of ways to circumvent the new rules.

When it comes to national codes and standards, you pretty much have no choice but to adapt to the new rules. So you might as well make it easy on yourself and start learning about the new rules in the 2008 National Electrical Code (NEC) right now with this issue of EC&M, starting on page 34. You know you'll have to abide by these new requirements in the near future anyway, right?

Once again, we asked our long-time Code expert Mike Holt to provide us with his Top 25 Code changes for this revision cycle. This list highlights the changes that will affect the majority of readers. In other words, these are the big-ticket items that will come up on many, if not most, of the projects you'll find yourself working on. Changes to the definitions and general requirements for grounding and bonding — and new requirements for AFCIs, GFCIs, and tamper-resistant receptacles — highlight the list. This issue also includes an in-depth feature on the new Article 708, Critical Operations Power Systems (COPS).

But this is just the tip of the iceberg. As the magazine has done for more than 100 years, we'll regularly discuss new and old requirements of the NEC in each and every issue. We'll also continue to supplement our NEC coverage in print through our electronic e-newsletter (CodeWatch) and special Code conferences. Our goal is to do everything we can to minimize the headaches and stress that accompany the change associated with adopting these new Code requirements. The decision to embrace these changes early on or be dragged along kicking and screaming is up to you.

About the Author

Michael Eby

Mike received a B.S. degree in electrical engineering in 1986 and an M.S. degree in engineering management in 1994 from the University of South Florida. He is currently a member of the National Fire Protection Association (NFPA), Institute of Electrical and Electronics Engineers (IEEE), Association of Energy Engineers (AEE), and American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE).

Prior to joining EC&M as Editor-in-Chief in September 1999, Mike served as the Executive Editor of Transmission & Distribution World magazine for five years. He currently serves as the Senior Director of Content - Buildings Group in the Infrastructure & Intelligence Division at Informa. Before joining Informa, Mike held various engineering titles within the Substation and Transmission Engineering Groups at Florida Power & Light Co., Juno Beach, FL.

Mike was awarded the Southeastern Electric Exchange (SEE) Excellence in Engineering Award in 1993 and has received numerous regional and national editorial awards for his reporting and writing work in the electrical market.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.