NEC in the Facility

May 21, 2009
If you have flammables on site, the first few Articles in Chapter 5 of the NEC are important to you.

If you have flammables on site, the first few Articles in Chapter 5 of the NEC are important to you. One question that arises in relation to these is, "What’s the difference between Zones and Divisions?"

Article 505 covers the requirements for the Zone classification system as an alternative to the Division classification system covered in Art. 500 for Class I, Zone 0, 1, and 2.

If you use the Zone system, then you must generate and maintain specific documentation that conforms to extensive specific references [505.4]. Exactly how you may classify a location depends on the properties and concentrations of the flammable substances that may be present [505.5].

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

Strut Comparison Chart

Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

NECA Manual of Labor Rates Chart

See how Champion Fiberglass compares to PVC, GRC and PVC-coated steel in installation.

Electrical Conduit for Bridges Guide

Learn about electrical conduit for bridge projects.