The timing of a thermographic survey can determine how much of that effort is wasted. Thus, avoid performing one shortly before a planned shutdown

The timing of a thermographic survey can determine how much of that effort is wasted. Thus, avoid performing one shortly before a planned shutdown. You want to use that shutdown to fix problems you found during the survey, and some repairs may involve significant lead times. Consider some of the resources:

  • Outside contractors. You may need a specialized firm to address those hotspots all over the MCC.
  • Spare parts. That replacement 2,000A breaker probably isn't going to be lying around on a shelf. It may even have to be built.
  • Special equipment. Renting a special test set on short notice may be doable for an extra fee, but renting a crane on short notice is normally not possible.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.