AMSC and DOE Agree to Collaborate on 10MW-Class Superconductor Wind Turbines

March 5, 2009
Project focuses on significantly increasing wind turbine power capacity to reduce cost of wind-generated electricity

American Superconductor Corp., Devens, Mass., recently announced that it has entered into a Cooperative Research and Development Agreement (CRADA) with the U.S. Department of Energy’s (DOE) National Renewable Energy Laboratory (NREL) and its National Wind Technology Center (NWTC) to validate the economics of a full 10MW-class superconductor wind turbine. Under the 12-month program, AMSC Windtec, Klagenfurt, Austria, a wholly owned subsidiary of AMSC, will analyze the cost of a full 10MW-class superconductor wind turbine, which will include a direct drive superconductor generator and all other components, including the blades, hub, power electronics, nacelle, tower, and controls.

The NWTC will then benchmark and evaluate the wind turbine’s economic impact, both in terms of its initial cost and its overall cost of energy. “The DOE and its NREL recognize that wind power will represent a significant fraction of our power production in the years to come,” says NREL Director Dan Arvizu. “High temperature superconductors hold promise for helping lower the overall cost of wind energy. We are pleased to be teaming with AMSC to move this technology forward.”

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.