Identify Leading Indicators During Preventive Maintenance

March 20, 2018
Create reports in your CMMS that include parameters so that leading indicators are automatically identified.

Traditionally, preventive maintenance (PM) is structured for X tasks to be performed at Y intervals. Cleaning and calibrating are common PM activities.

Calibrating involves taking a measurement; If it’s out of spec, you adjust the equipment to bring it back in spec. Mission accomplished, and you move on. What is left out is a determination of why the equipment was out of spec and whether that means anything in a predictive sense.

Economists look at “leading indicators” to predict where the economy is heading. Some types of events influence the economy several weeks or months after they happen. You can, and should, use this principle for maintenance.

For example, consider the contacts on a breaker. If, during your PM, you find excessive pitting just as you did on the previous PM for this breaker, then that’s significant. That repeated problem is a leading indicator that the mean time between failures (MTBF) is going to be abnormally short.

For critical equipment, consider creating reports in your CMMS where you include parameters so that the CMMS will automatically identify leading indicators. For other equipment, simply have a checkbox on the PM form and rely on individual judgment.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.