In this episode, Russ finds another violation of the dedicated space requirements outlined in Sec. 110.26(E) of the NEC. The steam pipes running directly over the top of this panelboard need to be relocated, or the panelboard needs to be moved.
In this episode, Russ finds another violation of the dedicated space requirements outlined in Sec. 110.26(E) of the NEC. The steam pipes running directly over the top of this panelboard need to be relocated, or the panelboard needs to be moved.