In this episode, Russ shows us why it’s not a good idea to use Schedule 40 PVC conduit in an area that exposes it to physical damage. This is a clear violation of Sec. 300.5(D)(4) of the 2014 NEC.
In this episode, Russ shows us why it’s not a good idea to use Schedule 40 PVC conduit in an area that exposes it to physical damage. This is a clear violation of Sec. 300.5(D)(4) of the 2014 NEC.