Try observing someone perform a maintenance PM from start to finish.

How can you identify time-wasters in your maintenance practices? Try observing someone perform a maintenance PM from start to finish. As the work progresses, identify the actions taken to complete each step (as delineated in the PM procedure).

Actions differ from steps. It may be a step to perform voltage measurements. It’s an action to remove a cover to get to the measurement points. It’s also an action if the tech encounters a locked door and must walk across the plant to sign out a key for it; make the key sign-out a step (in the proper sequence, before going to the work site) to eliminate the action of walking back to get the key.

You can do much to eliminate unnecessary actions. Be careful about eliminating steps; make that call on the technical merits of the step rather than on the need to save time performing the work.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...

Champion Strut Catalog

Champion Fiberglass is the most advanced manufacturing facility of fiberglass conduit, fiberglass bridge drain and fiberglass strut systems in the world. Its well-trained and ...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...