ECM Buyers' Guide

What's Wrong Here?

Oct 26, 2007 11:52 PM, By Joe Tedesco, NEC Columnist

Hint: Fill it with ice.

Nicholas Volpenhein, a project manager with Volpenhein Brothers Electric in Cincinnati, came upon this icy installation, although it was not his company’s doing. “This is what happens when you forget to seal a conduit in a freezer,” he says.

What’s wrong with this picture? NEC 300.7, Raceways Exposed to Different Temperatures (A) Sealing, states: “Where portions of a cable raceway or sleeve are known to be subjected to different temperatures and where condensation is known to be a problem, as in cold storage areas of buildings or where passing from the interior to the exterior of a building, the raceway or sleeve shall be filled with an approved material to prevent the circulation of warm air to a colder section of the raceway or sleeve. An explosionproof seal shall not be required for this purpose."

> Try Another Quiz

Want to use this article? Click here for options!

product of the week

Evaluation Software

December 1, 2008 9:59 AM

Honeywell Power Evaluation Software

View all 2008 Products of the Week

Recent Comments

Follow comments on ecmweb.com




Arc Flash Conferences   Code Change Conferences

Professionals provide answers to your questions.



Do you have any technical paper explaining IBC?

iGard Resistance Grounding Q&A BookletDownload the Resistance Grounding Q&A Booklet
I-Gard
EC&M TV

Retrofit 2-Gang TV Box(TM)

Arlington’s recessed two-gang TV BOX™ for old work allows you to mount LCD and plasma TVs, and other system components flush against the wall.

Listen
"Sizing Gen-Sets: Facts, Hints, and Good Judgment"
Listen
Sponsored By:

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Back to Top

Browse Back Issues

Browse Back Issues