Cross-Craft Training

March 22, 2013

Consider what happens when Eric, an electrician, replaces a failed motor. Being diligent, he checks the gearbox and finds it's low on oil. He fills it with 140W gear oil from a drum in the maintenance shop, and also greases a suspect bearing.

Because Eric used grease that's incompatible with the grease already in the bearing, that bearing will soon fail. Because this gearbox requires 90W gear oil and he used a much heavier oil, several problems including increased motor current will result.

Cross-craft training would have prevented this, but so would have another type of training. Eric's errors were in preventive maintenance (PM) actions. If he'd understood that all PM work should be done via a PM work order, he wouldn't have made these errors. Why? Because the PM work order shows which lubricants to use. Train maintenance techs to use the PM work order system, even if the PM work is part of a repair.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...