More Preventive Maintenance in Less Time, Part 3

June 9, 2015
By eliminating low- and no-value tasks from your PM procedures, you free up that precious resource known as technician time

By eliminating low- and no-value tasks from your PM procedures, you free up that precious resource known as technician time. The good news is there's even more low-hanging fruit ready for you to pick.

Consider what happens when a technician goes out to do PM work, and then only after arriving at the equipment realizes the job requires something that’s back at the shop. This means a wasted round trip to the shop. The low hanging fruit here is you can eliminate that waste by listing the needed tools, test equipment, and supplies in checklist form in the PM. Technicians need to understand they don’t leave to do the PM without those items checked off.

Think a bit beyond the PM itself, too. In Part 4, we’ll look at easy ways to save huge time with PM work.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

Champion Strut Catalog

Champion Fiberglass is the most advanced manufacturing facility of fiberglass conduit, fiberglass bridge drain and fiberglass strut systems in the world. Its well-trained and ...