Code Quiz

Aug. 27, 2007
A construction site has 10 office trailers. Each unit is identical. The HVAC unit for each trailer has a motor-rated load current of 27A and a branch circuit selection current of 30A at 208VAC, 3-phase. What is the proper size for the ground-fault, short-circuit protective device for each HVAC unit?

Q. A construction site has 10 office trailers. Each unit is identical. The HVAC unit for each trailer has a motor-rated load current of 27A and a branch circuit selection current of 30A at 208VAC, 3-phase. What is the proper size for the ground-fault, short-circuit protective device for each HVAC unit?

  1. 30A
  2. 40A
  3. 45A
  4. 50A

Answer: D

As per 550.4(A), a mobile home not intended as a dwelling unit (i.e., contractor’s on-site offices) shall not be required to meet the provisions of Art. 550 pertaining to the number or capacity of the circuits required. If the supply voltage is something other than a 120V or 120/240VAC power supply system, Art. 550 does not apply.

Let’s run through the calculation required to determine the proper size of protective device for each HVAC unit in this example.

As per 440.22(A), “A protective device having a rating or setting not exceeding 175% of the motor-compressor rated load current or branch-circuit selection current, whichever is greater.” Therefore, 30A X 1.75 = 52.5A. Round down to 50A for the final answer.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at [email protected].

About the Author

Steven Owen

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Don't Let Burn-Through Threaten Another Data Center or Utility Project

Get the No Burn-Through Elbow eGuide to learn many reasons why Champion Fiberglass elbows will enhance your data center and utility projects today.

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.