What's Wrong Here?

Feb. 1, 2004
Hint: These flexible cords are “temporarily” being used outside on a concrete crushing site to supply various pieces of electrical equipment.

How well do you know the Code? Think you can spot violations the original installer either ignored or couldn't identify? Here's your chance to moonlight as an electrical inspector and second-guess someone else's work from the safety of your living room or office. Joe Tedesco, who has a knack for finding shoddy electrical work, did the dirty work and found this mess. Now it's your turn to identify the violation.

Find the Answer

Mike Barnish, senior electrical designer, Shaw Infrastructure, Inc., Aiken, S.C., questions the temporary nature of this installation. “Temporary? I'll bet that the flexible cord wiring is probably still there as a substitute for the permanent wiring,” Barnish wrote. He goes on to say that not only are the cords not protected from physical damage, but that this installation doesn't even come close to meeting the requirements of 400.8. “Some will argue that it is OK to use cords for the connection of utilization equipment to facilitate frequent interchange. Sorry, but flexible cords and cables simply cannot be used as a substitute for the fixed wiring of a structure, or for this purpose.”

Bradley Nichols, electrical designer, Stearns and Wheler Engineers, Cazenovia, N.Y., added, “If it was true that the cords were used for this temporary installation, then they must be protected from any accidental damage. In this case these cords are likely to be damaged and violate 527.4(H), which states, ‘Flexible cords and cables shall be protected from accidental damage. Sharp corners and projections shall be avoided. Where passing through doorways or other pinch points, protection shall be provided to avoid damage.’”

Shajan Jacob, CEM, senior analyst, NUS Consulting Group, Park Ridge, N.J., also noted that if this job were properly designed, the various circuits would have to be properly protected and would have to originate in an approved distribution center. “I'm afraid that this situation is not easy to rectify, so it may have been allowed on this type of property being away from the public. But where do we draw the line?”

About the Author

Joe Tedesco

Tedesco served the industry in many roles during his career. He was a director, senior electrical code instructor for National Technology Transfer, Inc. and American Trainco, Inc.. He was also a codes, standards and seminar specialist for the International Association of Electrical Inspectors and an electrical field service specialist for the National Fire Protection Association in Quincy, Mass. He ran his own business as an NEC consultant and is a Massachusetts licensed master electrician and journeyman electrician and certified electrical inspector (one and two family 2A; General 2B, and Plan Review, 2C). Tedesco also wrote articles for CEE News and EC&M (Code Violations Illustrated and What's Wrong Here?) for more than 15 years and helped launched the Moving Violations video series.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.