Ecmweb Com Nec Whats Wrong Here Tmp00001 1 Web

Whats Wrong Here?

Oct. 21, 2010
Hint: No, that's not a battering ram

How well do you know the Code? Think you can spot violations the original installer either ignored or couldn't identify? Here's your chance to moonlight as an electrical inspector and second-guess someone else's work from the safety of your living room or office. Joe, who has a knack for finding shoddy electrical work, did the dirty work and found this mess. Now it's your turn to identify the violation.

Find the Answer

This red metal pipe is the handle on one of two trash bins at a condominium complex. The trash bins are rolled onto the street and emptied into a garbage truck three times a week. When the trash handler pushes the bin back into place, he does so with no regard to the metal switch plate. As you can see, this abuse has occurred for some time now. I imagine that under the right circumstances this cover plate could fall off and the metal bin could become energized.

As an electrical designer, you can specify a higher mounting location for a switch. According to 404.8(A), switches are to be operated from a readily accessible place. The NEC defines "readily accessible" as "Capable of being reached quickly for operation, renewal, or inspections without requiring those to whom ready access is requisite to climb over or remove obstacles or to resort to portable ladders, and so forth." The center of the grip of the operating handle of the switch or if a circuit breaker, when in its highest position, cannot be more than 2.0 m (6 ft 7 in.) above the floor or working platform.

The rules covering grounding of general-use snap switches and grounding of enclosures are located in 404.9(B) and 404.12.

> Try Another Quiz

About the Author

Joe Tedesco

Tedesco served the industry in many roles during his career. He was a director, senior electrical code instructor for National Technology Transfer, Inc. and American Trainco, Inc.. He was also a codes, standards and seminar specialist for the International Association of Electrical Inspectors and an electrical field service specialist for the National Fire Protection Association in Quincy, Mass. He ran his own business as an NEC consultant and is a Massachusetts licensed master electrician and journeyman electrician and certified electrical inspector (one and two family 2A; General 2B, and Plan Review, 2C). Tedesco also wrote articles for CEE News and EC&M (Code Violations Illustrated and What's Wrong Here?) for more than 15 years and helped launched the Moving Violations video series.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.