Siemens to supply power distribution equipment for ethanol plant

March 20, 2002
Siemens Energy & Automation, Alpharetta, Ga., recently signed a deal with general contractor Lurgi PSI, Memphis, Tenn., to supply a range of power distribution equipment for a new ethanol plant to be built for Adkins Energy LLC, near the town of Lena, Ill. The company will supply about $300,000 in electrical apparatus to the 40 million gallons corn-to-ethanol plant, consisting of low- and medium-voltage

Siemens Energy & Automation, Alpharetta, Ga., recently signed a deal with general contractor Lurgi PSI, Memphis, Tenn., to supply a range of power distribution equipment for a new ethanol plant to be built for Adkins Energy LLC, near the town of Lena, Ill.

The company will supply about $300,000 in electrical apparatus to the 40 million gallons corn-to-ethanol plant, consisting of low- and medium-voltage motor control centers, panelboards, switchboards, capacitors, and transformers.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.