September Winners

Nov. 1, 2008
Our three winners this month were: Marsha Squier, a certified permit technician I with Glenn County Building Department in Willows, Calif.; Scott Bitzer, a designer with High Voltage Maintenance Corp. in Dayton, Ohio; and Gary Hill, a master electrician in Baileyville, Maine. Here's a list of the Code sections they noted as being violated. 230.28 Service Masts as Supports. Where a service mast is

Our three winners this month were: Marsha Squier, a certified permit technician I with Glenn County Building Department in Willows, Calif.; Scott Bitzer, a designer with High Voltage Maintenance Corp. in Dayton, Ohio; and Gary Hill, a master electrician in Baileyville, Maine. Here's a list of the Code sections they noted as being violated.

  • 230.28 Service Masts as Supports. “Where a service mast is used for the support of service-drop conductors, it shall be of adequate strength or be supported by braces or guys to withstand safely the strain imposed by the service drop. Where raceway-type service masts are used, all raceway fittings shall be identified for use with service masts. Only power service-drop conductors shall be permitted to be attached to a service mast.”

  • 810.12 Supports. “Outdoor antennas and lead-in conductors shall be securely supported. The antennas or lead-in conductors shall not be attached to the electric service mast. They shall not be attached to poles or similar structures carrying open electric light or power wires or trolley wires of over 250 volts between conductors. Insulators supporting the antenna conductors shall have sufficient mechanical strength to safely support the conductors. Lead-in conductors shall be securely attached to the antennas.”

See the scope of Art. 810 as well.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

A Powerful Duo: Fiberglass conduit and solar applications

Learn how strong, durable fiberglass conduit excelled in an environment with dense cable and helped make a complex burial much simpler for the contractor to help this customer...

Champion Fiberglass® Conduit Protects Cabling For New York's First Offshore Wind Farm

Learn how fiberglass conduit supported a heavy cable load and a buried installation to help this project reach a successful outcome.