In this episode, Russ shows us an installation that violates Sec. 400.12(7) of the 2017 NEC. Flexible cords are not permitted where subject to physical damage. This installation also violates Sec. 110.12(B), which states no damaged parts may be operated that adversely affect safe operation of equipment.