| | | | | | Look at this broken raceway that Russ LeBlanc found. It appears as if someone tried to repair it with duct tape and hose clamps. It clearly didn’t take. |
|
|
|
| |
|
|
|
| | Sponsored | | A dangerous shock hazard exists when electronics operate with the panel door open. Avoid the danger & OSHA fines. Cabinet Cooler Systems are CE compliant, stop electronic control downtime with cold 20 deg F air and maintain the NEMA 4, 4X, 12 rating. |
|
|
|
| |
|
|
|
| | | | Are fixed storage type water heaters considered to be a continuous load? |
|
|
| | This Tech Talk explores the different types of overcurrent conditions affecting motors, the relevant NEC code rules, and practical guidelines for selecting appropriate protection devices, focusing on Art. 430. |
|
|
|
| |
|
|
|
| | | Fill in the blank. Where an elevator control panel is installed, it shall be marked with its _____ current rating. |
|
|
|
| |
| | Sponsored | Romex® NM-B cable is the trusted choice for residential pro contractors nationwide, delivering reliable performance, straightforward installation, and dependable quality for dry-location wiring applications. Its proven design, including the smooth-pulling SIMpull® jacket and Copper-Only conductors, gives pros the confidence they need for safe, code-compliant work that holds up over time. |
|
|
|
| |
|
|
|
| | | Article 210 provides the requirements for branch circuits. As with most NEC articles, it has its own general requirements. Like the arrangement in many articles, those consist of Part I. |
|
|
|
| |
| | Sponsored | Stack Caddy™ is a stackable modular storage system built for electricians who need small parts, tape, bits, fasteners, and jobsite essentials organized and ready to grab. Explore the full line, including Panel Caddy™ Tool Deck, Panel Caddy™ T-Bone, Wirenut Koozie™, Drill Bit Holder, Wirenut Storage Buddy™, and Inspector Series Caddy™. |
|
|
|
| |
|
|
|
| | | Is the inspector really responsible for finding what's wrong with your electrical installation? In the latest Code Conversations, Paul Abernathy sits down with Ellen Parson and explains why electrical contractors should perform their own quality-control check before calling for an inspection |
|
|
| Fill in the blank. Reconditioned type ENT _____ be installed. |
|
|
|
| |
| | | Test your knowledge about arc flash safety with this quiz and enter for a chance to win a $25 gift card to Amazon! |
|
|
| How well do you know the Code? Think you can spot violations the original installer either ignored or couldn’t identify? Hint: Pigtail problem. |
|
|
|
| |
|
|
|
| | |
|
| | |
|