| | | | | | This year’s NECA Show in Las Vegas was too big to cover in one day. The Everyday Electrician Trever Ottmann and Editor Michael Morris hit the show floor again on the second day to check out what they missed on day one. There was no shortage of interesting new products for them to see! This gallery showcases some of their booth visits and the products that caught Trevor’s eye. |
|
|
|
| |
| | Sponsored | Stop by Booth #1803 at NECA 2026 in Las Vegas to see our solutions designed to improve power reliability, efficiency, and safety while uncovering new opportunities and revenue streams. We’re committed to building strong partnerships with electrical contractors that advance the electrification and digitalization and help us push the industry forward, together. #NECA2026 |
|
|
|
| |
|
|
|
| | | The NECA 2026 trade show in Las Vegas showcased groundbreaking products and emerging trends in the electrical and construction industries. See what products made it into Day 3 of the Editor's Choice. |
|
|
|
| |
| | Sponsored | Overhead electrical installations don't always need to be complicated. Griplock Systems cable suspension provides a clean, adjustable way to support lighting, conduit, cable tray and other applications. With fewer components to handle and easy height adjustment, cable suspension gives electrical crews a modern way to approach the job. |
|
|
|
| |
|
|
|
| | | EC&M and Electrical Wholesaling editors share their favorite moments from the NECA show in Las Vegas, highlighting key events and memorable interactions on the show floor. |
|
|
|
| |
| | Sponsored | Underground systems demand materials that withstand corrosion, dense cabling, and a broad temperature range. Download this eBook to explore how Champion Duct® fiberglass conduit supports efficient installation and resilient performance across direct buried and encased buried applications. |
|
|
|
| |
|
|
|
| | | Learn how to implement effective prefab strategies, including stakeholder engagement and process documentation, to improve field performance and maintain brand integrity. |
|
|
|
| |
| | Sponsored | Comfort and durability belong on the same job. GlenGuard AR/FR fabric delivers a soft, lightweight feel backed by hard-working performance and protection. Its solution-dyed construction helps maintain color and durability wash after wash, keeping workers comfortable and ready for the demands of the field. |
|
|
|
| |
|
|
|
| | | Discover the behind-the-scenes of the NECA show commute as Trevor Ottmann documents his walk from the Luxor Hotel to the Mandalay Bay Convention Center, offering a quick-paced glimpse into the daily routine of an electrician attending the event. |
|
|
|
| |
| | Sponsored | When your customer can’t afford downtime, ABB’s machine and motor control solutions deliver fast-installation and reliability that keep your service calls short and contracts long. Visit booth 2723 to see products designed for motor starting, protection and power switching across a wide range of industrial applications. |
|
|
|
| |
|
|
|
| | | This article highlights the significant updates in the 2026 NEC, focusing on changes in electrical protection, grounding, system design, and field applications, emphasizing the importance of staying current with code revisions. |
|
|
|
| |
| | Sponsored | BURNDY power tape products help safeguard electrical systems through dependable insulation, sealing, and moisture and mechanical protection. Discover how they help support reliable performance in demanding applications. |
|
|
|
| |
|
|
|
| | | Abernathy discusses the role of electrical inspectors and the importance of understanding the distinction between Code requirements and design enhancements. |
|
|
|
| |
| | | Learn how SIF frameworks prioritize high-energy hazards like electrical, gravitational, and mechanical risks, and how proactive planning, controls, and human performance awareness can significantly reduce the likelihood of life-threatening events on construction sites. |
|
|
|
| |
|
|
|
| | Members Only | This EC&M Tech Talk examines the changes to the grounding and bonding requirements of Art. 250 Grounding and Bonding found in the National Electrical Code. Randy Barnett, maintenance and construction electrician, first discusses the removal of Part X of article 250 into a new Article 270 Grounding and Bonding of Systems over 1000VAC, 1500VDC, Nominal. |
|
|
|
| |
| | | Contractors who call for inspection too early can damage credibility, delay projects, and create avoidable issues. |
|
|
|
| |
|
|
|
| | |
|
| | |
|