Mismatched neutral and braided ground
James Jones Jr., senior electrical engineer for BPLW Architects & Engineers Inc., El Paso, Texas, took these photos (at left) of an existing computer server room inside an office building. The feeder serving the room is single-phase. It originates from a panel about 50 ft away. The contractor tapped phases B and C respectively by sharing the same lug as the incoming main feeder serving the panel.