Waukesha introduces new engine leasing program

In response to the ongoing electrical energy crisis in this country, Waukesha Engine, Waukesha, Wis., recently announced a new lease program for its Enginator engine/generator packages. The program offers users reliable distributed generation with no capital risk and the flexibility to re-lease, purchase, or return the equipment at lease end. Customers can arrange total financing, including shipping,
Nov. 9, 2001

In response to the ongoing electrical energy crisis in this country, Waukesha Engine, Waukesha, Wis., recently announced a new lease program for its Enginator engine/generator packages. The program offers users reliable distributed generation with no capital risk and the flexibility to re-lease, purchase, or return the equipment at lease end. Customers can arrange total financing, including shipping, installation, building costs, infrastructure costs, and engineering within the program’s flexible funding methods.

Because Waukesha Enginator engine/generators use clean burning natural gas fuel, they do not require on-site fuel storage. Pre-packaged with a generator and available in sizes up to 2.9MW each, the engines serve as part of a distributed generation on-site power program where users don’t have to rely on the local power grid. Instead, they can provide power for prime or peak-shaving applications and stand-by emergency power.

For more information, visit www.waukeshaengine.dresser.com.

Sign up for EC&M Newsletters
Get the latest news and updates.

Voice Your Opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!