GE Launches Project Assistant

Feb. 11, 2010
New Web-based tool delivers plans for engineers in 15 minutes

Over the past two years, GE Energy's Electrical Distribution Division has developed a Web-based tool. Project Assistant allows engineers to gather electrical distribution specs, drawings, and budget prices for a building in the planning stages in about 15 minutes. This process can normally take hours, days, or even weeks to complete.

Project Assistant estimates are designed to support buildings where the utility service is up to 4,000A at 480V for the United States (600V for Canada) with a 2MW maximum and is expected to cover about 90% of commercial and institutional new building projects.

"The simplicity of the Project Assistant's six steps will be a real benefit to engineers," says Lisa Bagwell, specification engineering manager at GE.

The Project Assistant’s six steps consist of registering or logging in, selecting a project type, selecting products, entering specifications, reviewing the summary, and collecting the results. The projects can be saved for future use in a password-protected database and drawings can be downloaded in PDF or DXF format for easy import into AutoCAD.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

A Powerful Duo: Fiberglass conduit and solar applications

Learn how strong, durable fiberglass conduit excelled in an environment with dense cable and helped make a complex burial much simpler for the contractor to help this customer...

Champion Fiberglass® Conduit Protects Cabling For New York's First Offshore Wind Farm

Learn how fiberglass conduit supported a heavy cable load and a buried installation to help this project reach a successful outcome.