Advances in test equipment open possibilities for reducing the window of exposure. Some innovations have eliminated some “routine” tasks altogether (for example, power monitors). Other innovations reduce total exposure time, but newer versions reduce it even further. For example, clamp-on ammeters and DMM inductive accessories solve the problem of having to break connections to measure current.

But the jaws you have may not be shaped for all of the wire access limitations you face. Even if you have an impressive collection of jaws, you might spend extra time in front of energized equipment pulling on cable bundles and cutting ties to allow your clamp to fit. That problem is now greatly alleviated by flexible clamps.

Cable testing during non-shutdown conditions is often necessary. Sure, you de-energize the circuit under test, but you're still working within range of an arc blast. Compared to previous generations, today's insulation resistance testers are faster, easier, and safer to use.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...

A Powerful Duo: Fiberglass conduit and solar applications

Learn how strong, durable fiberglass conduit excelled in an environment with dense cable and helped make a complex burial much simpler for the contractor to help this customer...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

Champion Fiberglass® Conduit Protects Cabling For New York's First Offshore Wind Farm

Learn how fiberglass conduit supported a heavy cable load and a buried installation to help this project reach a successful outcome.