Griffin Electric Completes Cambridge Rindge and Latin School Project
Wayne J. Griffin Electric, Inc. has completed the electrical installation work at the Cambridge Rindge and Latin School in Cambridge, Mass. The 403,000-square-foot high school recently underwent a gut-renovation and modernization, which consisted of the addition of technologically advanced classrooms, an updated library, and new food court, as well as, a new arts building for the institution’s nationally-recognized theater arts program.
Griffin Electric was responsible for the installation of new lighting, lighting controls, and power within the facility, plus systems for fire alarm, sound/paging and lightning protection. Additionally, the Griffin team installed a generator, telecommunications and distribution equipment, as well as, photovoltaic panels on-site.
Consigli Construction Co., Inc., in joint venture with J&J Contractors, Inc., of Milford, Mass., served as the project’s general contractor, while HMFH Architects, Inc. of Cambridge, Mass., was the architect, and TMP Consulting Engineers, Boston, the electrical engineer.
The project is expecting a LEED Silver certification.