Skip to main content
EC&M header logo

The Leading Resource of Electrical Design, Construction and Maintenance

  • National Electrical Code
  • Design
  • Construction
  • Safety
  • Training
EC&M mega menu logo
Sections
National Electrical Code
Design
Construction
Safety
Training
Maintenance, Repair & Operations
Electric Vehicles
Test & Measurement
Power Quality & Reliability
Special
Members Only
Podcasts
Videos
Magazine
Webinars
White Papers
Power Lists
Code Quiz of the Week
The Everyday Electrician
Contact
About Us
Contact Us
Subscribe
Newsletters
Content Contributor Guidelines
Advertise
Affiliated Brands
ELECTRICAL WHOLESALING
ELECTRICAL MARKETING
AMERICAN SCHOOL & UNIVERSITY
CODE CHANGE CONFERENCES
Follow us on
https://www.facebook.com/ElectricalConstructionMaintenanceMagazine
https://www.instagram.com/ecmmagazine/
https://www.linkedin.com/company/electrical-construction-maintenance/
https://twitter.com/ecmmagazine
https://www.youtube.com/user/ecmwebtv

Design

DLC
nlcfeaturedimages
Lighting & Control

DLC Releases Updated Networked Lighting Controls Technical Requirements

Taking effect on August 3, 2026, NLC V5.2 strengthens support for quality lighting, controls and integrated building systems
June 25, 2026
ID 52258627 © Joe Sohm | Dreamstime.com
dreamstime_xxl_52258627
Construction

Amazon Plans $10 Billion Missouri Data Center Campus

June 23, 2026
ID 38697919 © Bigapplestock | Dreamstime.com
EC&M On Air — Insights on Recruiting & Training the Future Generation of Electricians
Training

EC&M On Air — Insights on Recruiting & Training the Future Generation of Electricians

EC&M On Air
June 22, 2026
istock530972345
Business & Industry

ABB Launches Power Connections Certification Program

June 16, 2026
ID 4882448 © Berean | Dreamstime.com
California- West coast USA. Detail shot of a globe, showcasing California.
Design

The Top 10 Highest-Paying Cities for Electrical Engineers: 2025

June 15, 2026
ID 19622199 © Dashark | Dreamstime.com
inside a data center
Design

Collaborative Standards for Sustainable and Efficient AI Data Center Operations

June 15, 2026
Courtesy of HED
With HED, Royal Oak, Mich., as a design partner, NTT fashioned a cutting-edge, 205,000-square-foot data center in 2024 in Itasca, Ill. HED’s electrical design contribution for the CH2 Data Center featured the use of prefabricated modular electrical enclosures; resilient power strategies to protect uptime and flexible distribution tailored to client needs; and use of a digital model that brought in all parties in real time, which minimized delays and rework without sacrificing technical rigor.
Top 40 Electrical Design Firms

Riding the Data Center Boom: EC&M’s 2026 Top 40 Electrical Design Firms Special Report

June 12, 2026
© Alexlmx | Dreamstime.com
6852e4b9b76676c55bdcbedetop40logo
Top 40 Electrical Design Firms

2026 Top 40 Electrical Design Firms Rankings

June 12, 2026
ellen_headshot_for_viewpoint
Industry Viewpoint

The Electrical Design Industry at an Inflection Point

June 11, 2026

Looking for Something?

footer logo EC&M
The Leading Resource of Electrical Design, Construction and Maintenance
Newsletters
The top stories, industry insights and relevant research, assembled by our editors and delivered to your inbox.
Connect
Follow us for the latest industry news and insights.
https://www.facebook.com/ElectricalConstructionMaintenanceMagazine
https://www.instagram.com/ecmmagazine/
https://www.linkedin.com/company/electrical-construction-maintenance/
https://twitter.com/ecmmagazine
https://www.youtube.com/user/ecmwebtv
Affiliated Brands
ELECTRICAL WHOLESALING
ELECTRICAL MARKETING
AMERICAN SCHOOL & UNIVERSITY
CODE CHANGE CONFERENCES
  • About Us
  • Advertise
  • Do Not Sell or Share
  • Privacy Policy
  • Terms & Conditions
EndeavorB2B Logo
© 2026 All rights reserved.