Making Time for Real Maintenance, Part 1

Feb. 16, 2016
Make the CMMS visible by using its advanced reporting tools.

When things are going well early in the life of a plant, people in other departments don’t observe maintenance people scrambling from one emergency repair to another. Instead, they may see maintenance people “sitting around the shop” (actually, reading training material or reviewing maintenance data). Or they may see maintenance people “chatting with operators” (actually, learning how the equipment works). From this, they conclude that maintenance people need “greater utilization.” And that’s when the fun begins.

Project work starts getting dumped onto the maintenance department. To get it done, some PM work is “deferred,” and pretty soon the proverbial snowball starts rolling.

Fast-forward a couple of years and the maintenance department is now in a reactionary mode. The plant engineer talks about ending preventable failures by getting back to good preventive and predictive maintenance. But to do that would require more resources (not available), fewer breakdowns (not going to happen), or some breakdowns not repaired (politically dangerous).

Because it seems there are no good options, the plant engineer usually selects the worst option: continue in reactionary mode.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...

A Powerful Duo: Fiberglass conduit and solar applications

Learn how strong, durable fiberglass conduit excelled in an environment with dense cable and helped make a complex burial much simpler for the contractor to help this customer...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

Champion Fiberglass® Conduit Protects Cabling For New York's First Offshore Wind Farm

Learn how fiberglass conduit supported a heavy cable load and a buried installation to help this project reach a successful outcome.