How to Get Your Next Motor Install Right the First Time
November 5, 2026
1:00 PM ET / 12:00 PM CT / 10:00 AM PT / 6:00 PM GMT
Duration: 1 hour
Already registered? Click here to log in.
A certificate of attendance will be offered.
Summary
Motor installations require careful navigation of NEC Article 430. Installers must know when to use motor nameplate values, when to rely on NEC tables, and how to properly size branch-circuit and feeder conductors, overload protection, and short-circuit and ground-fault protection.
This webinar will explain the terminology and Code requirements that apply to different motor types and applications. Drawing on his extensive motor installation and maintenance experience in commercial and heavy industrial environments, Randy Barnett will walk attendees through a logical, systematic process for achieving safe, efficient, and NEC-compliant installations.
Attendees will come away from this event with the knowledge to:
• Interpret the motor nameplate information needed for an installation.
• Determine when to use motor nameplate values and when to use NEC table values.
• Size motor branch-circuit and feeder conductors properly.
• Select and size overload protection, circuit breakers, and fuses.
• Apply NEC requirements for motor controllers and disconnecting means.
• Identify special installation requirements based on motor type, duty, and application.
• Apply applicable grounding and bonding requirements for motor installations.
• Navigate Article 430 and locate the NEC rules needed to complete a motor installation correctly.
Speaker
