Code Q&A
Q. We do a lot of generators for residences, and only recently have been getting written up on our transfer switches. The inspectors are saying that if I use the transfer switch to transfer the entire house — and I put it between the meter and the service disconnect — then the transfer switch must be 'service rated.' Can you help me understand the rules, please?