Code Quiz: Grounding of Strut-Type Channel Raceway

July 3, 2013
NEC rules on grounding strut-type channel raceway

When working with strut-type channel raceway, when is it permissible to use a snap-fit metal cover to provide electrical continuity for receptacles mounted in the cover?

A. Any time. This is always acceptable.

B. You're not permitted to use a snap-fit metal cover to provide electrical continuity for receptacles mounted in the cover.

C. Only when the metal cover is a minimum of 1/16 in. thick

D. Only when the metal cover is a minimum of 1/8 in. thick

Answer: B

Article 384 of the 2011 NEC covers strut-type channel raceway. As noted in 384.60, "Where a snap-fit metal cover for strut-type channel raceways is used to achieve electrical continuity in accordance with the listing, this cover shall not be permitted as the means for providing electrical continuity for a receptacle mounted in the cover."

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at [email protected].

About the Author

Steven Owen

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...

A Powerful Duo: Fiberglass conduit and solar applications

Learn how strong, durable fiberglass conduit excelled in an environment with dense cable and helped make a complex burial much simpler for the contractor to help this customer...

Champion Fiberglass® Conduit Protects Cabling For New York's First Offshore Wind Farm

Learn how fiberglass conduit supported a heavy cable load and a buried installation to help this project reach a successful outcome.