Pre-pour sleeves

Designed for use with Evolution poke-thru devices, Evolution pre-pour sleeves attach to the structural decking and maintain a 61/8-in. or 81/8-in. cast-in hole.
Aug. 17, 2009

Designed for use with Evolution poke-thru devices, Evolution pre-pour sleeves attach to the structural decking and maintain a 61/8-in. or 81/8-in. cast-in hole. Each sleeve includes three attachment legs, thumb screws, and end caps. After the pour, users simply remove the pre-pour sleeve and insert the poke-thru device in the hole. The sleeve, which is not a fire-classified product, must be removed.

Wiremold/Legrand

For more information, visit www.wiremold.com.

Sign up for our eNewsletters
Get the latest news and updates

Voice Your Opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!