Ecmweb 2039 9 2 11

Compression splice kits

Sept. 2, 2011
Homac Copper Flood-Seal compression splice kits require no heat guns, pull cords, cutting, or taping to install a watertight seal

Homac Copper Flood-Seal compression splice kits require no heat guns, pull cords, cutting, or taping to install a watertight seal, according to the company. The kits feature a pre-lubricated, sized, single-piece cover that slides on and locks in place. Available in wire sizes No. 2, 1/0, 2/0, 3/0, 4/0, 250kcmil, 350kcmil and 500kcmil, the products install in four steps and meet or exceed ANCI C119.4 standards.

Thomas & Betts

For more information, visit www.tnb.com.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

A Powerful Duo: Fiberglass conduit and solar applications

Learn how strong, durable fiberglass conduit excelled in an environment with dense cable and helped make a complex burial much simpler for the contractor to help this customer...

Champion Fiberglass® Conduit Protects Cabling For New York's First Offshore Wind Farm

Learn how fiberglass conduit supported a heavy cable load and a buried installation to help this project reach a successful outcome.