EC&M

The Leading Resource of Electrical Design, Construction and Maintenance

  • National Electrical Code
  • Design
  • Construction
  • Maintenance/Repair/Operations
  • Safety
mega-logo
Sections
National Electrical Code
Design
Construction
Maintenance/Repair/Operations
Safety
Training
Electric Vehicles
Test & Measurement
Power Quality & Reliability
Special
Members Only
Podcasts
Videos
Magazine
Webinars
White Papers
Power Lists
Code Quiz of the Week
The Everyday Electrician
Contact
About Us
Contact Us
Subscribe
Newsletters
Content Contributor Guidelines
Advertise
Affiliated Brands
ELECTRICAL WHOLESALING
ELECTRICAL MARKETING
AMERICAN SCHOOL & UNIVERSITY
CODE CHANGE CONFERENCES
Follow us on
https://www.facebook.com/ElectricalConstructionMaintenanceMagazine
https://www.instagram.com/ecmmagazine/
https://www.linkedin.com/company/electrical-construction-maintenance/
https://twitter.com/ecmmagazine
https://www.youtube.com/user/ecmwebtv
  • Installation Tips

    Photo 1. It is possible to drag an electrical arc from Phase B to Phase C (center to right terminals) when measuring voltage. Notice that the worker is pulling the black test lead toward him or herself before placing it on Phase C. Simply sliding the black test lead from the center to the right-hand terminal could establish a phase-to-phase arcing fault through the airspace between the terminals.
    Training

    Use It, or Lose It

    Five practical tips to keep you at the top of the electrical trade
    April 7, 2021
    the safety net of grounding and bonding
    Basics

    The Safety Net of Grounding and Bonding

    March 7, 2018
    Image
    Test & Measurement

    Six-Step Plan for Bending Raceway

    Nov. 21, 2016
    Image
    Test & Measurement

    How to Drill a Hole Quickly and Correctly

    Oct. 20, 2016
    Image
    Test & Measurement

    How to Never Round a Nut or Bolt Head

    Sept. 23, 2016
    Image
    Test & Measurement

    Wiring Device Box Mounting Basics

    Aug. 22, 2016
    Image
    Basics

    Choosing the Right Cable Insulation for Medium-Voltage Installations

    July 19, 2016
    Image
    Test & Measurement

    Motor Wiring, Part 2

    May 24, 2016
    Image
    Test & Measurement

    Motor Wiring, Part 1

    April 22, 2016

    Looking for Something?

    EC&M
    The Leading Resource of Electrical Design, Construction and Maintenance
    Newsletters
    The top stories, industry insights and relevant research, assembled by our editors and delivered to your inbox.
    Connect
    Follow us for the latest industry news and insights.
    https://www.facebook.com/ElectricalConstructionMaintenanceMagazine
    https://www.instagram.com/ecmmagazine/
    https://www.linkedin.com/company/electrical-construction-maintenance/
    https://twitter.com/ecmmagazine
    https://www.youtube.com/user/ecmwebtv
    Affiliated Brands
    ELECTRICAL WHOLESALING
    ELECTRICAL MARKETING
    AMERICAN SCHOOL & UNIVERSITY
    CODE CHANGE CONFERENCES
    • About Us
    • Advertise
    • Do Not Sell or Share
    • Privacy Policy
    • Terms & Conditions
    Endeavor Business Media Logo
    © 2025 All rights reserved.