Question: An additional service is permitted when the capacity requirements exceed ___________ amps at a supply voltage of 1,000V or less.
See answer below.
Answer: 2,000
Explanation: The answer to this question is found in Sec. 230.2(C)(1). That section permits an additional service "Where the capacity requirements are in excess of 2,000A at a supply voltage of 1,000V or less."
Lupacchino is a senior design engineer with Gaylor Electric, Inc. in Noblesville, Ind. and serves as an alternate on NEC Code-Making Panel No. 3. He is currently licensed in more than 80 jurisdictions. He can be reached at [email protected]
About the Author
John Lupacchino
Senior Design Engineer
John began his career in electrical construction as an apprentice and worked his way through the trade. He is currently licensed in more than 80 jurisdictions. With more than 35 years of experience, he now plays a vital role in Gaylor Electric’s Engineering Department, where he serves as a senior design engineer. With a focus on design engineering, quality assurance, and code compliance, he has earned the highest level of respect from industry professionals alike. John currently serves as an alternate on NFPA 70 Code Making Panel No. 3. In addition, he enjoys sharing his electrical knowledge through education. As an Associated Builders and Contractors instructor, he continues to help grow a new generation of high-performing construction leaders.