August 2022

Electrical Construction & Maintenance: Volume 121, Issue 8
The grounded conductor (white) is terminated in the panelboard on the grounded busbar. The green screw is the main bonding jumper connecting the grounded busbar to the enclosure. A threaded hub (upper right) provides secure bonding to metal enclosures. The smaller bare copper conductor on the left is the equipment grounding conductor providing bonding. The larger bare copper on the right is the grounding electrode conductor that connects the grounded busbar to the grounding electrode system (i.e., the ground rod held in the upper left).
Aug. 11, 2022
An in-depth look at how to apply all 10 Parts of NEC Art. 250 in the field
personal protective equipment product showcase
Aug. 10, 2022
Check out these new PPE products for professionals in the electrical industry.
Failure Brochure #1
Aug. 10, 2022
Causes and cures for the most common types of motor failure and operation disruption plus best practices for increased performance
ID 83369965 © Vaeenma | Dreamstime.com
Billing Management
Aug. 10, 2022
A way to maximize your profits

More content from August 2022

Fig. 1. Transformers used as a Class 2 power source must be listed.
Aug. 10, 2022
Using Class 2 circuits may eliminate shock or fire hazards, but only if you install them correctly.
Promoimage2
Aug. 10, 2022
Everything electrical professionals need to know about upcoming updates and changes to the latest edition of the NESC
© John Wollwerth | Dreamstime.com
Photo 1. This aerial view of the bow of an empty cargo ship demonstrates the severity of the current supply chain distribution problem.
Aug. 10, 2022
There’s no shortage of work, but there is a shortage of just about everything required to do that work.
Gerald Talbot
Aug. 10, 2022
Tips for best serving your customers’ EV charger needs
solar panel array on roof of building
July 27, 2022
How the NEC has evolved to bring clarity to how supply-side interconnections are made
Courtesy of Mayfield Renewables
large solar farm in rural setting
July 26, 2022
What codes and standards should PV and ESS installers be familiar with?
UF cable emerging from ground without protection
July 22, 2022
See the latest code violations from NEC Consultant Russ LeBlanc.
receptacle outlet on bathroom wall
July 22, 2022
How Sec. 210.11(C)(3) evolved into a rule that is easy to understand and apply
outdoor four-gang outlet without protective cover plate
July 22, 2022
Can you spot the Code violation in this photo?