• February 2025

    Electrical Construction & Maintenance: Volume 124, Issue 2

    More content from February 2025

    ID 330196603 © Thanyarat Deepradap | Dreamstime.com
    Fiber Optic Cable in Data Center
    Subject matter experts answer your most pressing questions about mastering cable installation and management in the data center space
    Feb. 26, 2025
    ID 171270756 | Ai © BiancoBlue | Dreamstime.com
    AI in Electrical Work
    As an electrical contractor or electrical engineer, artificial intelligence is working with you and for you — not against you, completing monotonous tasks humans aren’t generally...
    Feb. 26, 2025
    Courtesy of AEI
    Data Center Infrastructure
    Innovative strategies for electrical design engineers to address growing energy demands in the data center space
    Feb. 26, 2025
    code requirements for branch circuits
    Branch circuits account for most circuits run in any electrical installation, so it pays to be familiar with the requirements.
    Feb. 24, 2025
    ID 113561630 © Nipa Sawangsri | Dreamstime.com
    Finding Hidden Safety Failures
    Most safety failures with potentially tragic consequences hide outside of reportable incident data.
    Feb. 21, 2025
    480V + ringed knockouts = bad news
    Can you spot the Code violation in this photo?
    Feb. 21, 2025
    ID 148267107 © Mkopka | Dreamstime.com
    January 2025 code iq
    How much do you know about the National Electrical Code?
    Feb. 21, 2025
    illustrated_catastrophe_feb25
    See the latest Code violations from NEC Consultant Russ LeBlanc.
    Feb. 21, 2025
    practically_speaking_jan25
    A look at the evolving NEC requirements for ceiling fans.
    Feb. 21, 2025